my second day seems to be less tough compared yesterday...
still no clear direction on what i'm goind to do...
but nonetheless, i'm trying to figure it out...
i just did what i can do and think of...
i talked to some people whom i think can help me...
i interviewed some engineers who were expert on their specific field...
had a brainstorming with my partner...
but in the end...
it's good to assumed something...
but sometimes assuming leads to missing something...
i forgot to review the WBS... waaaaaaaaaaaahhh....
i'm dead again! oh well...
i think that's what life is all about...
it SUCKS! =)
p.s.
i was able to watch this Jdorama (Japanese Drama) entitled Densha Otoko (The Train Man)... it was funny.. and cool...
i've learned another Japanese term -- Otaku!
i'm still on episode 3 where the Otaku had a second dinner date with Hermes-san.
WBS (Work Breakdown Schedule)
Posted by areman at 10/18/2005 04:51:00 PM
Subscribe to:
Post Comments (Atom)

0 comments:
Post a Comment